How does the ZhiLaiZhang smart outfall device achieve zero discharge in dry weather and precise interception in rainy weather?
The device integrates level, flow and water quality sensing at the outfall. In dry weather, it identifies abnormal sewage and automatically triggers interception while raising an alarm. In rainy weather, it dynamically adjusts the interception ratio based on rainfall intensity and internal pipe level, preventing sewage from entering the river while avoiding large volumes of rainwater entering the sewer system and overloading the network.
How does ZhiLaiZhang achieve active flood drainage?
The intelligent outfall system device "ZhiLaiZhang" (i-Water-SPM) achieves active flood drainage and intelligent monitoring of the outfall manhole through the anti-flooding pump and level detection inside its chamber, and delivers precise control of the sewage level. Its configurable dimensions cover: three base-pump types (hot-dip galvanized steel, stainless steel, and a fiberglass combination), three power-source types (mains power, battery, hydraulic, solar, diesel/gasoline), four control methods (forced/automatic, remote, local program, cyclic inspection), and discharge arrangements covering standalone, piped, yard, pump, siphon and other scenarios. The device provides camera-based night detection with AI alarming, four remote functions (communication / inspection / remote control / remote adjustment), an API for data interfacing, and a design life of no less than 10 years. Five diameters are covered — 500, 800, 1000, 1200, 1500 and 2000 — with the pipe diameter, material, level measurement method and other options specified through combinations of 7-digit parameter codes.
What advantages does ZhiLaiZhang offer compared with flap gate elevation adjustment, overflow weirs and electric sluice gates?
Comparison dimension Flap gate elevation adjustment Overflow weir construction Electric sluice gate ZhiLaiZhang Operability Relatively difficult Average Average Easy and fast Sewage interception performance Good Poor Fairly good Very good Flood drainage performance Poor Uncertain Poor Good Anti-backflow performance Average Poor Poor Very good Investment High Low Relatively high Low Technological content None None Average Digital O&M The Achilles heel of the electric sluice gate: on power loss or overpressure the gate cannot be opened, which easily leads to waterlogging; installation conditions are highly restricted and demanding. What is different about ZhiLaiZhang: it drains floodwater automatically on power loss, network loss or overpressure, giving second-level emergency response; installation is fast, and it adapts to manholes, under bridges and uneven surfaces. It leads on all six dimensions, does not depend on an external power supply or on civil works modification, and is the only path that can be replicated at scale. Cost advantage of no-excavation retrofit: the investment in no-excavation in-situ retrofit of the intelligent flap gate is about 65% lower than that of an excavated intelligent separation well — the most persuasive economic argument in old urban districts and legacy sewer network renovation scenarios.
What is the fundamental difference between ZhiLaiZhang and the five types of traditional devices?
Device Flood discharge during power failure Key characteristics ZhiLaiZhang SPM ✅ Opens automatically; the gravity flap gate function is restored as soon as power is lost Flexible variable-direction multi-point loading; single-phase 220V/400W, annual electricity cost Hydraulic flap gate / hydraulic sluice gate ❌ Cannot drain floodwater when power or pressure is lost Single-rod point loading, prone to deformation and leakage under high head differential; requires three-phase power + a hydraulic power unit Pneumatic flap gate ❌ Cannot open when power or pressure is lost Requires an air compressor station; poor closure sealing on large flap gates Gravity flap gate △ Relies on self-weight; fails as it ages Sealing depends on pressing against the contact surface; seepage occurs wherever the contact is not tight Electric sluice gate ❌ Cannot open on power failure or over-pressure At fastest about 8 minutes; strict requirements on wall flatness and installation space The key difference lies in the default direction at the moment power is lost: when a hydraulic sluice gate loses power, the gate leaf cannot be lifted and its default state is “closed”; when ZhiLaiZhang loses power, the mechanism drops back and the gate opens under the action of the gravity flap gate, so its default state is “open”.